*Unit #110 Ground floor
*1948 Lock Box Code
* NO Ceilings
JOB PLAN: 40-48 hours
CREW SIZE Required (2-3 persons)
MATERIALS/ PAINT/ SUPPLY CHECKLIST:
Interior Painting - Includes Labor, Paint, & Supplies
Surfaces Include: - Walls and Trim Only
Does Not Include:
Scope of Work - Protection all surfaces not being painted - Floor protection on all carpet and flooring - Patch and Spackle all Nail holes - Sand all patches and Spray Can Texture as needed; Remove Caulk around Tub and Recaulk; Caulk any cracks - Spot Prime any bare drywall and spackled areas; Full Prime on Dark Room Walls -(1-2) Coats Brush and Roll
Paint: Walls and Trim: Promar 200 0 VOC Egshell (Color TBD)
Includes Labor and Materials
Ensure all lighting is working with matching bulbs in vanity. Bulbs replaced are TENANT CHARGE
Install blinds in 2nd bedroom (currently missing), replace 2 missing vertical slats in living room, replace dining room blinds that are cracked/bent/broken