Proposal #3118925

Darrell Peterson
petersondarrell079@gmail.com
(262) 893-5830
1112 Greenmeadow Dr
Waukesha, WI 53188
HK Decorating and Painting Professionals
3575 S Brentwood Road
New Berlin, WI 53151
Phone: (262) 894-6245
Proposal # 3118925
Proposal Date 7/22/2026
Proposal Amount $886.86
Job Address 1112 Greenmeadow Dr

Waukesha, WI 53188

Project Terms

SCOPE OF WORK

  • All surfaces will receive preparation prior to painting as needed
  • All work performed within the agreed upon areas and surfaces only
  • Door painting includes one side only unless both sides are explicitly listed
  • Any additional areas or surfaces not listed are subject to additional charges

COLOR SELECTION

  • Customer is fully responsible for selecting and providing all colors prior to project start
  • Colors must be confirmed before work begins — delays in color selection may affect the project schedule
  • We are happy to suggest colors, but final decisions rest entirely with the customer
  • If colors are disliked after application, repainting is available at an additional charge
  • HK Painting is not responsible for colors that don't appear as expected once applied
  • Paint brand and product are selected entirely at our discretion
  • By accepting this quote, you accept full responsibility for your color choices

PAINT & MATERIALS

  • All paint and materials supplied by contractor unless otherwise stated
  • Customer-supplied paint is not covered under warranty
  • Sheen and color selections to be confirmed prior to start date

PROJECT EXPECTATIONS

  • Minor imperfections in surfaces may remain visible after painting
  • Contractor is not responsible for pre-existing conditions including cracks, moisture damage, or settling
  • Touch-ups are included within the original scope only and must be requested within 30 days of completion

PROJECT PAYMENT

  • 10% due at start, remaining balance due at completion
  • Accepted: Cash, Check, or Credit Card (3.5% fee applies)
  • Warranty activates upon payment in full

2-YEAR LABOR WARRANTY

  • Covers peeling or blistering within original scope of work
  • Does not cover horizontal surfaces, moisture/rust damage, customer-supplied paint, mildew, color matching, or pre-existing conditions
  • Unforeseen repairs are additional unless otherwise stated

Line Items
Product / Service Quantity Price Subtotal Tax Total
Painting Preparation

INCLUDED:

  • All surfaces will be sanded, patched, caulked, and spot primed as needed prior to painting
  • Loose or peeling paint will be scraped and surfaces cleaned of dust and grease
  • All adjacent surfaces masked and taped, floors and furniture protected with drop cloths and plastic sheeting
  • Large furniture moved by our team, customer responsible for removing all small items and personal belongings prior to start date
  • Outlet covers, switch plates, door hardware, and hinges removed and reinstalled
  • Major drywall repairs not included unless explicitly listed in the scope of work
BOOK WITHIN A WEEK FOR DISCOUNT 1.00 ($50.00) / Ea ($50.00) $0.00 ($50.00)
Cash Sales Discount 1.00 ($59.97) ($59.97) $0.00 ($59.97)

Subtotal
Tax
($109.97)
$0.00
Total ($109.97)

Areas
$

Exterior Repaint
$719.50
Item Total ($)
Siding
- Exterior Body
EXT (Stain) | Sherwin-Williams | Woodscapes®
$719.50


Garage
$277.33
Item Total ($)
Siding
- Exterior Body
EXT (Stain) | Sherwin-Williams | Woodscapes®
$277.33

Subtotal
Tax
$996.83
$0.00
Total $996.83


Proposal Summary
Areas Total $996.83
Line Item Total ($109.97)

Proposal Total $886.86


Photo Appendix:

Photo 2
Proposal Image
Photo 1
Proposal Image